Land Acquisition

Providing assistance in land acquisition up to award stage as per new LA act.12-05-2015 & Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (LARR)

Get Free Quote

  • Preparation of Land acquisition proposals Land acquisition proposal will be prepared as per Revenue Departments requirement including collection of sale deed for last three years, collection of ready reckoner rates, collection of village map, preparation of proposal for approval of town planning department including typing, xeroxing printing and submission in booklet with 5 copies.
  • Establishment of Primary Ground Control Points (PGC) using Differential GPS, measured in WGS 84 System and then grid Co-ordinates obtained applying proper projection System.
  • Carrying out Traverse for Preparing Horizontal control base for preparation of detail survey map by using Total Station between both GPS control point.
  • Preparing land plans and land schedule including carrying out planetable survey for private/forest/govt. land on both side of road in rural and urban areas. The work of plotting and certificate from Dy. SLR or other authorities shall be obtained for correctness of prepared plans, tracing and taking out prints and preparing the requisite booklets duly bounds and printing with all materials etc. Three land plans booklets along with original tracing shall be supplied including procurement of village maps/forest land plans from concerned authorities. Note: – the item planetable includes following points.

1) Charring plane table survey.
2) Plotting of duly surveyed area.
3) Collection of data from Dy. SLR Authorities and verifications of survey maps by Dy. SLR Authorities.
4) Preparing three booklets of survey maps, binding etc.
5) Charring out planetable survey of the private/forest land along the road upto 50 Mtrs.

  • Transferring and staking out design co-ordinates of base line on ground using nails for existing road surface and survey pegs for new alignment including staking out co-ordinate for horizontal curve at required interval of 50m etc complete (extra line such as right of way, median edge, toe line etc not include)
  • Co-ordination for Joint measurement process: City Survey / Dy. SLR office will carry out the joint measurement survey after issuing notices to the respective property owners. As there is not sufficient manpower, equipment and funds available with the land record department this activity always gets delayed. In this activity Consultant will help City Survey officers to carry out joint measurement under their guidance. Consultant will provide them all necessary help to execute the job as early as possible. Consultant will assist them to prepare a joint measurement sheet on computer & calculation of area statement & printing of six copies for joint measurement purpose so that they will send the proposal back to the Special Land Acquisition officer for further activities.
  • Conducting Survey & valuation to the respective property owners affecting in road project for providing compensation to owners
  • Conducting tree valuation to the respective tree owners affecting in road project for providing compensation to owners.
  • Providing vehicle for joint measurement and allied activity of City survey office/ Dy. SLR. Office.
  • Demarcation of road boundary (ROW) including fixing boundary stones of standard size and shape including fixing in block of standard size of C.C. of 1:4:8 white washing at 50 meter internal on both sides.
  • Co-ordination with Revenue Department to speed up the Land acquisition process up to possession. This activity consists of issuing various notices to the property owners. As well liaison up to collector’s office to speed up the award process.